Navigation

Projects > Pile Remediation

MCC undertook to rectify the corrosion protection system on piles. This was achieved through installation of STOPAQ pile jacketing system from the lower level of the tidal zone through to top of the piles.MCC utilised a rope access team for works above high water level. This project was completed successfully.